In-Depth Insights into Injection Molding Cycles

Injection molding cycle is the core link of precision manufacturing, which directly determines product quality, production efficiency and cost. It refers to a complete time loop starting from mold clamping, followed by injection, packing, cooling, mold opening, ejection, and returning to the mold clamping state. The core of cycle optimization is to achieve "optimal time" on the premise of ensuring quality rather than blind compression, and it is necessary to accurately control the key points of each stage.

 

  1. Key Points of the 6 Core Stages in Injection Molding Cycle

 

A complete cycle consists of 6 closely connected stages, and the parameters of each stage must be adapted to the characteristics of raw materials, molds and products:

 

 In-Depth Insights into Injection Molding Cycles 1

  • Mold Clamping Stage: Basic Guarantee

The moving mold and fixed mold are accurately closed and locked to provide a sealed space for injection. The core is "fast-slow-stop" speed control: fast mold clamping first to improve efficiency, switch to low pressure before fitting to avoid collision, and high-pressure locking finally to prevent flash. Parameters must match mold size and clamping requirements.

 

  • Injection Stage: Core of Molding

The screw pushes molten plastic into the cavity. The key parameters are injection pressure, speed and volume. Raw materials with poor fluidity (e.g. PC) or complex thin-walled parts require higher pressure; speed needs to be controlled in sections to avoid defects such as short shot and flash.

 

  • Packing Stage: Key to Compactness

Continuous pressure is applied to make up for shrinkage after injection, which compensates for the cooling shrinkage of melt and improves product density. Packing pressure is 40%-70% of injection pressure, and the time matches the solidification time of the gate—excessively long time causes internal stress, while excessively short time leads to shrinkage.

 

  • Cooling Stage: Core of Efficiency

Accounting for 50%-70% of the whole cycle, heat is dissipated through the mold cooling water channels to solidify and shape the plastic. Water temperature should be set according to raw materials (e.g. 20-30℃ for PP), water channels should be evenly distributed, and cooling time is based on the standard that products are ejected without deformation.

 

  • Mold Opening Stage: Safety & High Efficiency

Following the "slow-fast-slow" principle: low-pressure unlocking first, then fast mold opening to shorten time, and slow mold stopping finally to avoid collision. The stroke must meet the requirement of finished product removal.

 

  • Ejection Stage: Final Guarantee
  • The finished products are smoothly ejected through mechanisms such as ejector pins and ejector blocks. The pressure and speed should be moderate to avoid ejector white marks and ejector cracks, and the stroke should ensure that the products are completely separated from the mold.

 

II.Core Influencing Factors

 

  • Raw Material Characteristics: Raw materials with good fluidity and fast cooling such as PE and PP have a short cycle; raw materials with poor fluidity and slow cooling such as PC have a long cycle; fiber-reinforced raw materials require adjustment of cooling parameters.
  • Mold Design: The cooling water channels, gate size and the precision of the guiding mechanism directly affect efficiency. Uniform water channels can greatly shorten the cooling time.

3. Product Structure: Thick-walled parts require a long cooling time; thin-walled and complex parts have higher requirements for injection parameters; high-precision products need a stable cycle.

 

  1. Key Skills for Cycle Optimization

 

  • Prioritize Cooling Optimization: Upgrading cooling water channels, increasing water flow rate, and achieving precise temperature control are the core of shortening the cycle.
  • Precisely Regulate Parameters: Adjust the injection speed in sections, set the packing time according to the gate solidification time, and avoid ineffective time consumption.
  • Optimize Mold Opening and Closing Speed: Reduce idle stroke time, balancing efficiency and mold protection.
  • Collaborative Matching: Link the parameters of raw materials, molds and equipment to avoid cycle fluctuations caused by mismatched parameters.

 

  1. Common Misunderstandings and Pitfalls to Avoid

 

  • Blindly Shortening Cooling Time: Easily leads to product deformation and shrinkage; the standard should be complete shaping.
  • One-Size-Fits-All Packing Time: Ignoring differences between products and raw materials; the optimal time should be determined through mold testing.
  • Neglecting Compatibility: Only adjusting equipment parameters without considering raw materials and molds, resulting in unstable cycles.

 

  1. Summary

The 6 stages of the injection molding cycle are closely interlinked, and the core of optimization is "the balance between quality and efficiency". Enterprises need to accurately control the parameters of each stage, comprehensively optimize in combination with the characteristics of raw materials, molds and products, and avoid the misunderstanding of blind speed increase. Only in this way can high-quality and efficient production be achieved and market competitiveness be improved.

prev
Reducing Waste in Injection Molding: From Process Optimization to Sustainable Production
recommended for you
no data
Get in touch with us
AAA MOULD Your one-stop expert for custom mold design, precision processing, and plastic molding solutions.
Copyright © 2025 AAA MOULD | Sitemap
Customer service
detect